STROOMWERK

Utility-scale energy infrastructure · EPC

STROOMWERK

The current has to come from somewhere. We build where.

52.51°N 5.47°E · ZONNEPARK FLEVOLAND · 06:14, FIRST LIGHT

0installed capacity
0substations delivered
0HV cable laid
0days without a lost-time incident

Who we are

We engineer, build and connect utility-scale power. From the panel to the socket, one contractor.

Solar parks, grid connections, substations and offshore support, carried by our own engineers and our own crews. The party that signs the contract is the party standing in the mud, and the one that answers the phone for the next twenty years.

Selected projects

Built, connected, producing.

A utility-scale solar farm at dawn, panel rows to the horizon

Zonnepark Flevoland

52.51°N 5.47°E · EPC + O&M

Capacity480 MWp
Grid connection150 kV, own substation
Energised2025
Households equivalent190,000

The largest single-site park in the country, engineered, built and connected in nineteen months. Producing four days ahead of the contract date.

A high-voltage substation and pylons at dusk

Netaansluiting Borssele

51.43°N 3.72°E · HV infrastructure

Voltage380 kV
ScopeSubstation + 14 km cable
Energised2024
Downtime since0 minutes

The connection that brings two gigawatts of offshore wind onshore. Zero unplanned outages since energisation, which is the only statistic this work is judged by.

Offshore wind turbines in golden light on the North Sea

North Sea service programme

OFFSHORE · BALANCE-OF-PLANT + CABLING

Turbine positions served214
Array cabling96 km
Contract horizon2032
Availability maintained97.8%

Long-term balance-of-plant and cabling support for two operating wind farms. The unglamorous work that decides whether the turbines actually turn.

Capabilities

From the panel to the socket, one contractor.

Every hand-off between parties is a place where a schedule dies. We removed the hand-offs.

01

Engineer

Grid studies, park design, permitting and the paperwork nobody photographs. Our own engineers, accountable for what our own crews will build.

02

Build

Civil, mechanical, electrical, carried by crews on our payroll. Fixed energisation dates. The schedule on day one is the schedule.

03

Connect and keep

Substations, cabling and the grid connection itself, then operations and maintenance for the life of the asset. We stay on the phone.

The numbers

Judged in megawatts, minutes and incident reports.

0installed and producing
0substations delivered
0high-voltage cable
0days LTI-free, and counting

The beginning

Bring us the site and the deadline.

We will tell you in the first conversation whether the date can be made, and we will still be saying the same thing at energisation.

Projects & tenders tenders at stroomwerk dot example Havennummer 2, Vlissingen Response within two working days